- 03 Sep, 2015 1 commit
- 01 Sep, 2015 2 commits
- 11 Aug, 2015 3 commits
-
-
* multiple flows with the same match to be simultaneously present in the flow store, and * similar but different rule in switch and store, resulting in flows stuck in PENDING_ADD state. Fixes ONOS-2426. Change-Id: I4b4e444c3a6dba7e4d3278e9469069e2dbdb9b67
Jonathan Hart authored
- 07 Aug, 2015 1 commit
-
-
* Added PartialFailureContraint to MP2SP intent to allow partial connectivity. This means the intent remains installed as long as at least one ingress point can reach the egress point. * Intents with this constraint are recompiled on ObjectiveTracker triggers even if not in FAILED state * MP2SP intent compiler can compute a partial tree if constraint is set * ObjectiveTracker recompiles intents on any link event * SDN-IP MP2SP intents now use PartialFailureConstraint Change-Id: I32eaa198fae1dfba021d9251c8f855573f0e1d7d
Jonathan Hart authored
-
- 05 Aug, 2015 3 commits
-
-
(cherry-pick of 6c82adee) Change-Id: I6ceab24a35a9143e5f04fa03b1c90bd61f8b06f8
Bri Prebilic Cole authored -
…ment for toolbar arrow in Safari. Change-Id: I36ebd929ae8c4ce56235db80e61599220e7834fa
Bri Prebilic Cole authored -
(cherry-picks from master 55ee09b1) Change-Id: Icfb3d80654a2ab009ca12b64f35a20ba98f37681
Bri Prebilic Cole authored
-
- 04 Aug, 2015 1 commit
- 30 Jul, 2015 1 commit
- 28 Jul, 2015 3 commits
- 27 Jul, 2015 1 commit
- 24 Jul, 2015 1 commit
- 21 Jul, 2015 1 commit
-
-
All other commands currently use 'start/stop/status'. ONOS-2417. Change-Id: I902da5b207ec3ca5809d6ae377d8b09ae1f6eeab
Jonathan Hart authored
-
- 20 Jul, 2015 1 commit
-
-
Change-Id: Ied5d67205ecf8ce8b08f78b073ad62488caf8b71 (cherry picked from commit e48f84ea)
Marc De Leenheer authored
-
- 17 Jul, 2015 2 commits
- 26 Jun, 2015 1 commit
- 25 Jun, 2015 10 commits
-
-
…when the application is uninstalled Change-Id: I5bf7678f50ff3ed2792313383ff738c356bef69f
Madan Jampani authored
- 24 Jun, 2015 6 commits
- 23 Jun, 2015 1 commit
- 22 Jun, 2015 1 commit